Water Resource Projects
Service Detail

Water Resource Projects

Checkdams, ponds, percolation tanks, and overhead storage in water-stressed areas

6 Work Scope Items
6 Technical Standards
4 Equipment Types

Overview

Construction of water harvesting and storage structures including checkdams, ponds, percolation tanks, and overhead water tanks to improve water availability in water-stressed rural areas.

Why This Matters

  • 01

    Water scarcity in the Bundelkhand and central MP belt directly reduces agricultural yields and forces seasonal migration.

  • 02

    Farm ponds and percolation tanks recharge groundwater during monsoon, stabilising water table for post-monsoon irrigation.

  • 03

    Checkdams on seasonal streams convert episodic flood flows into storable water - extending effective availability by 3-4 months.

  • 04

    Overhead tanks and community water supply structures are basic civic infrastructure under Jal Jeevan Mission.

  • 05

    Every 100 farm ponds constructed can benefit 250-400 farming families through improved kharif and rabi irrigation.

Work Scope

  • Checkdam construction (masonry / RCC)
  • Farm pond construction
  • Percolation tank construction
  • Overhead water storage tanks
  • Underground sump construction
  • Recharge shaft construction

Technical Specifications

Checkdam Foundation
Hard rock / dense soil - CWC norms
Masonry Grade
CM 1:3 for hydraulic structures
Farm Pond Lining
HDPE 0.5 mm or compacted clay
Overflow Weir Design
25-yr flood frequency discharge
OHT Design Code
IS 3370 (water retaining structures)
Water Tightness Test
24-hr ponding test before handover

Work Process

01

Hydrological Survey

Catchment area analysis, stream flow assessment, and siting study for checkdam / pond location.

02

Design Review

Structural design verification per departmental specifications, storm return period, and soil bearing capacity.

03

Foundation Excavation

Excavation to hard strata, dewatering, and foundation preparation.

04

Masonry / RCC

Sequential masonry or RCC construction with quality testing of materials and concrete batches.

05

Backfill & Compaction

Backfilling and compaction around structures, approach bank formation.

06

Water Test & Handover

Ponding test to confirm water tightness, departmental inspection, and formal handover.

Machinery Used

Excavator
Concrete Mixer
Vibrators
Roller

Typical Clients

  • Groundwater Department
  • MNREGS Executing Agencies
  • Watershed Development Authority
  • NGOs (Water & Sanitation)

Need This Service?

Send us your project brief or tender document and we will respond within 24 hours.

Get in TouchChat on WhatsApp
All Services

Before & After

Before
Before
After
After

Site Gallery

Water Resource Projects site photo 1
Water Resource Projects site photo 2
Water Resource Projects site photo 3
Common Questions

Frequently Asked

Common questions from engineers, procurement officers, and NGO teams about this service.

Ready to Execute

Start Your Project

Share your tender brief or project scope. We respond within 24 hours with a proposal.