Road & Drainage Works
Rural access roads, link roads, and stormwater drainage systems
Overview
Construction of rural access roads, link roads, and drainage systems connecting villages to main roads and ensuring stormwater management for rural and peri-urban communities.
Why This Matters
- 01
Rural road connectivity reduces post-harvest losses by enabling timely transport to mandis - every km of road is an economic multiplier.
- 02
Proper drainage alongside roads prevents failure from waterlogging - unlined shoulders and absent drains cause rapid deterioration.
- 03
PMGSY and CM Gram Sadak Yojana actively fund rural road construction for all-weather access to unconnected habitations.
- 04
Stormwater drainage in rural settlements prevents waterborne disease and infrastructure damage during monsoon.
- 05
Culvert and causeway construction on seasonal streams opens year-round connectivity in flood-prone rural zones.
Work Scope
- Gravel / WBM / CC roads
- Bituminous (BT) road works (surface dressing)
- Kerb and channel construction
- Storm water drains (brick / RCC)
- Culverts and causeways
- Road marking and signage
Technical Specifications
Work Process
Alignment Survey
Road alignment staking, cross-section surveys, and drainage design in coordination with approved DPR.
Subgrade Preparation
Formation cutting, filling, and compaction to specified subgrade level and CBR requirements.
Drainage First
Side drains, culverts, and cross-drainage structures built before road surface.
Base Course
Granular sub-base (GSB), water bound macadam (WBM), or base course layers compacted in lifts.
Wearing Surface
CC slab / BT surface dressing / gravel surface as per design - finished to grade and camber.
Final Inspection
Roughness measurement, drain functionality check, and quality register completion before handover.
Machinery Used
Typical Clients
- PWD
- PMGSY Programme Units
- Urban Local Bodies
- Gram Panchayat
Need This Service?
Send us your project brief or tender document and we will respond within 24 hours.
Get in TouchChat on WhatsAppBefore & After
Site Gallery
Frequently Asked
Common questions from engineers, procurement officers, and NGO teams about this service.
Start Your Project
Share your tender brief or project scope. We respond within 24 hours with a proposal.